I
Comprehensive Building Condition Assessment and Handover Technical Audit
Iskaan Tech
Dubai, UAEAED 10,000-16,667/moToday
UAEEngineering & ManufacturingFull Time
Skills Required
ElectricalHvacSafety
Job Description
<div><h3>Comprehensive Building Condition Assessment and Handover Technical Audit</h3><p><b>Objective</b></p><p>To conduct a comprehensive Building Condition Audit (excluding fire alarm, firefighting, CBS, and voice evacuation systems) in line with the latest RERA requirements, with the primary objective to:</p><ul><li>Identify all building defects and deficiencies</li><li>Establish a clear, measurable, and execution-ready snag list</li><li>Enable HOAM to proceed with rectification works strictly based on the audit findings</li></ul><p><b>Scope of Services</b></p><p>1. Technical Inspection&Assessment – Carry out a detailed inspection of all accessible common areas, systems, and components, including but not limited to:</p><ul><li>HVAC systems</li><li>Plumbing and drainage systems</li><li>Electrical systems</li><li>Elevators and vertical transportation</li><li>BMS and ELV systems</li><li>Any other building‑related services and components</li></ul><p>The consultant shall:</p><ul><li>Identify all defects, deficiencies, and performance issues</li><li>Assess severity and urgency of each defect</li><li>Highlight any condition impacting safety, durability, or functionality</li></ul><p>2. Exclusions – Fire Alarm, Fire Fighting, CBS, and Voice Evacuation Systems.</p><p>3. Snag Identification&Classification – All identified issues shall be:</p><ul><li>Clearly defined and individually listed</li><li>Classified as<b>Severity level</b></li><li>Supported with:</li><ul><li>Photographic evidence</li><li>Description of defect</li><li>Recommended rectification method</li></ul></ul><p>4. Mandatory Reporting Requirements – A. Detailed Snag Register (Core Deliverable) – Each snag must include severity level and recommended rectification. Estimated cost per snag to be submitted in a separate document and excluded from the BCA report. A consolidated summary shall be provided per system and for the overall building.</p><p>C. Final Report – Submit a clear, structured, and RERA‑aligned technical report, including risk‑based prioritization and consolidated snag register. Upon completion of rectification works, the same consultant shall conduct re‑inspection of all identified snags, verify closure status, and remark on incomplete or ongoing works.</p><p>5. RERA Compliance Requirement – The audit and reporting shall be in line with the latest RERA Law, follow accepted technical audit and documentation practices, be suitable for reserve fund justification (if required), conduct full site inspection prior to submission, ensure complete building coverage, no variation due to incomplete inspection, coordinate with HOAM/FM team, and attend clarification meetings without additional cost.</p><p>6. Commercial&General Conditions – No variation will be accepted after submission. Scope shall be deemed fully understood. Timeline must be clearly defined. Submission shall be building‑specific.</p><p><b>Location</b></p><p>Riviera Dreams, International City, Dubai, United Arab Emirates.</p></div>#J-18808-Ljbffr
Similar Opportunities
Executive Assistant - Manufacturing background
Black Pearl Consult
Dubai, UAEAED 10,000-16,667/moToday
UAEEngineering & Manufacturing
HVAC Project Development Engineer: Design, Costing & Solutions
Johnson Controls
Dubai, UAEAED 7,000-18,000/moToday
UAEEngineering & Manufacturing
Tendering Engineer & HSE Support
Lucy Group
Dubai, UAEAED 7,000-18,000/moToday
UAEEngineering & Manufacturing
Aerospace Engineer
India Abroad
Al Ruwais, QatarQAR 12,600-31,500/moToday
QatarEngineering & Manufacturing
Industrial Engineer
Ecojob
Al Ruwais, QatarQAR 8,400-21,000/moToday
QatarEngineering & Manufacturing
Senior Traffic & Road Safety Engineer - Lusail
Egis
Lusail, QatarQAR 7,350-18,900/moToday
QatarEngineering & Manufacturing