JobsAisle
I

Comprehensive Building Condition Assessment and Handover Technical Audit

Iskaan Tech

Dubai, UAEAED 6,000-16,000/moYesterday
UAEEngineering & ManufacturingFull Time

Skills Required

ElectricalHvac

Job Description

Comprehensive Building Condition Assessment and Handover Technical AuditObjectiveTo conduct a comprehensive Building Condition Audit (excluding fire alarm, firefighting, CBS, and voice evacuation systems) in line with the latest RERA requirements, with the primary objective to:Identify all building defects and deficienciesEstablish a clear, measurable, and execution‑ready snag listEnable HOAM to proceed with rectification works strictly based on the audit findingsScope of ServicesTechnical Inspection & AssessmentCarry out a detailed inspection of all accessible common areas, systems, and components, including but not limited to:HVAC systemsPlumbing and drainage systemsElectrical systemsElevators and vertical transportationBMS and ELV systemsAny other building‑related services and componentsExclusionsFire Alarm, Fire Fighting, CBS, and Voice Evacuation SystemsSnag Identification & ClassificationAll identified issues shall be:Clearly defined and individually listedClassified as:Supported with:Photographic evidenceDescription of defectRecommended rectification methodMandatory Reporting RequirementsA. Detailed Snag Register (Core Deliverable)Each snag must include:Severity levelRecommended rectificationEstimated cost per snag shall be submitted in a separate document and strictly excluded from the BCA reportA consolidated summary shall be provided per system and for the overall buildingB. Final ReportSubmit a clear, structured, and RERA‑aligned technical report, including:Risk‑based prioritizationConsolidated snag registerUpon completion of rectification works, the same consultant shall:Conduct re‑inspection of all identified snagsVerify closure statusRemarks on incomplete or ongoing worksRERA Compliance RequirementBe in line with latest RERA Law.Follow accepted technical audit and documentation practices.Be suitable for:Reserve fund justification (if required)Conduct full site inspection prior to submissionEnsure complete building coverageNo variation due to incomplete inspectionCoordinate with HOAM / FM teamAttend clarification meetings without additional costCommercial & General ConditionsNo variation will be accepted after submissionScope shall be deemed fully understoodTimeline must be clearly definedSubmission shall be building‑specificAttend any clarification meetings or site walkthroughs after report submission, at no extra charge.Job reference: JB004-26-01311#J-18808-Ljbffr